• Jimah
  • TGPS2
  • Kuala Ketil
    Photovoltaic Plant
  • GROWTH ASSET
    MELAKA PROJECT
    (MALAYSIA)

We own five power plants in Malaysia, with a total effective capacity of 4,5683 MW, making us the second largest independent power producer in the country.

We have three CCGT power plants (one with co-generation facilities), one sub-critical coal-fired thermal power plant and one large scale solar photovoltaic plant.

 

Jimah is a 1,400 MW sub-critical coal-fired base load thermal power plant located at Jimah, Port Dickson, Negeri Sembilan.

The Group owns 75.0% effective interest in the Jimah plant through its subsidiary, Jimah Energy Ventures Holdings Sdn Bhd. TNB hold the remaining effective interest through its shareholding in Jimah Energy Ventures Holdings Sdn Bhd of 25.0%.

Plant Information

Type of Plant

Sub-critical coal-fired base load thermal power plant

Equipment

Boiler: Ishikawajimah-Harima Heavy Industries (IHI Co, Ltd) (2 x 700 MW)
Turbine: Toshiba Corporation
Interconnection facility: Taisei Corporation

Fuel Type
  • Main Fuel – coal (pulverised)
  • Startup Fuel – diesel
COD Jan 2009

TGPS2 is a 720 MW combined cycle gas turbine (CCGT) power plant located at Telok Gong, Melaka.

The Group owns 100.0% effective interest in the TGPS2 plant through its subsidiary, Panglima Power Sdn Bhd.

Plant Information

Equipment

Gas Turbine: Siemens Aktiengesellschaft V94.3A2 (2 X 230 MW)
Steam Turbine: Siemens Aktiengesellschaft K-Series (1 x 260 MW)
HRSG: Hanjung (Doosan) (2 x Reheat, triple pressure, unfired)

Fuel Type Dual Fuel
  • Primary – Natural Gas
  • Backup - Distillate
COD Feb 2002

KLPP is a 675MW combined cycle gas turbine (CCGT) power plant with co-generating facilities, located at Kuala Langat, Selangor.

The Group owns 75.0% effective interest in the KLPP plant through its subsidiary, Kuala Langat Power Plant Sdn Bhd. The remaining 25.0% is owned by Worldwide Holdings Berhad.

Plant Information

Equipment Gas Turbine: Alstom 13E2 M (3 x 165 MW), GE 6551B (1 x 34 MW) and GE 5001N (1 x 20 MW)
Steam Turbine: Alstom DKZ2 – 2N37 (1 x 245 MW)
HRSG: Combustion engineering (unfired)
Fuel Type Dual Fuel
  • Primary – Natural Gas
  • Backup – Distillate
COD Jan 1996

The Photovoltaic Plant is located in Kuala Ketil, Kedah, Malaysia and is expected to have a capacity of 50 MWac.

Commenced commercial operation in February 2019.

The Group owns 100.0% effective interest in the Solar Plant through its subsidiary, Edra Solar Sdn Bhd.

Plant Information

Equipment Solar
COD Feb 2019

The Edra Melaka is a 2,242 MW combined cycle gas turbine (CCGT) power plant located at Alor Gajah, Melaka

The Group owns 100% effective interest in the Edra Melaka Power Plant through its subsidiary, Edra Energy Sdn Bhd.